Friday, May 30, 2008

Model Making

On Wednesday i visited my grandparents at their farm in Euroa. All the materials used in the building of this model are recycled and all the tools were already on site. The model was made to scale using the measurements that were given to me by PJ Yttrup, with the exception of the column. It wasn't feasible to construct a model that was going to be several meters long as i would not have been able to transport it to the university. Instead i opted to give it a reasonable length, with the main component being the actual connecting of the two elements.

The following pictures and descriptions show the process of how the the model was completed.

The steel we wanted to use was to long, so we marked out sections and used 2 and a half pieces to get the correct measurements.

The angle grinder was then used to cut two pieces of steel to the size above. We then used clamps to keep them together to get the desired thickness before we welded the two pieces together.


The welding process then began, first the two pieces of steel that were being used for the base plate followed by the two and a half pieces of steel that were being used for the steel reinforcement inside the LVL column.

A small piece of steel was then cut and placed on top of the steel reinforcement before being welded into place. We then marked up the base plate so that the steel would sit exactly in the middle.

Once the steel was welded a grinder was used to get rid of any sharp edges. We then covered the steel in a plasti-bond filler and sanded it down to fill any holes.

To make the "LVL" column we used several pieces of scrap marine plywood which we cut into pieces then glued and nailed together. Because the steel reinforcement would be going inside the frame we also needed to ensure that it wasn't hollow so we had to fill the frame we had made with extra pieces of timber to make it more realistic.

The steel was spraypainted silver to give it a galvanised look and to hide any blemishes that had been caused during the welding etc. The "LVL" column we originally constructed was finished with some natural wood plywood to give it a nicer finish before we began drilling holes into it.
We used the holes on the column to mark off where the holes would need to be placed on the steel then proceeded to drill the holes into place. Holes were then drilled into the base plate and the construction of the section really began. We had to line up the frame with the pieces of timber inside it and the steel to be able to bolt the entire thing together.

Off-cuts from the natural wood plywood were used to seal the bottom of the column before bolting the base plate to the concrete. The only thing left to do now is varnish the timber.

1 comment:

kimbo said...

Hi Emma
Love your work
Dad