One of the main considerations for a project of this size, and being located in such a central location of Geelong, would be access for craneage and equipment and the delivery of the concrete panels
Monday, May 26, 2008
Unfinished Site Visit 2: TAC
On this particular day i got the oppurtunity to watch a concrete panel being lifted into place on one of the upper levels. The panel was inititally laid out on site (along with other panels) before being connected to the crane which hoists them up the appropriate level. A cherry picker is used to carry the employees to the landing where they will secure the panel.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment