Monday, June 2, 2008

Unfinished Site Visit 4: Warehouse, Grovedale

Whilst i was driving through Grovedale i stumbled across this warehouse site in Essington Street. I was fortunate enough to get permission, from a group of concreters who were on site, to take some photos. The Builder for this project was David Anderson for the Master Builders

Shows the connection from the purlins to the rafter. You can also see the insulation in this picture.

The connection between the bracing and propping to the concrete tilt-up to the concrete slab.

In this picture you can see the bracing and propping in full length. The cross bracing in the cieling is connected to the rafter along with the purlins. Again in this photo you can see the insulation.

Again the bracing and propping is evident in this photo but you can also see the girts and how they have been connected to the concrete panel.

You can almost see the full span of the rafters in this picture and how the purlins are connected to them. You can also see the extent of the bracing and propping and how it is needed for each concrete panel. The bracing and insulation in the cieling is also evident.

What the tilt-up concrete panel looks like in full close up view.

View of the site from the outside.


Completed warehouse in the neighbouring lot.